IBM DS Controller Layer

Use the tests mapped to this layer to monitor the status of the controllers and the traffic to and from each controller so that, a potential overload can be isolated and averted, and controllers in a degraded/failed state can be identified.

Figure 1 : The tests mapped to the IBM DS Controller layer